Skip to main content
Wide aerial view of roadworks and land preparation within one of the delivered private developments

Project

Infrastructure Delivery for Private Developments

We delivered infrastructure across private developments in Madinah and Jeddah as main contractor, through fourteen separate contractual packages representing a broad range of infrastructure scopes.

Project Facts

Client
Private Developers
Contract
Multiple Contracts
Contractor role
Main Contractor
Area of work
Infrastructure & Roads
Status
Completed
Location
Madinah and Jeddah

Project

Project Overview

We delivered fourteen separate infrastructure packages across private developments in Madinah and Jeddah as main contractor, with all fourteen packages completed. The work covers land development, roads, water and sewage networks, water transmission pipelines, service connections and lighting. The portfolio includes water and sewage networks across several developments, a water transmission pipeline, a full-development package, and separate road and lighting works. Each of the fourteen packages is presented below with its own scope name, value and status. The accompanying photographs show infrastructure works across the private-development portfolio without attributing any image to a specific package.

Scope of Work

The packages span land development, roads, lighting, water and sewage networks, transmission pipelines and service connections.

Networks & Connections

Water, sewage and service-connection works delivered across the schemes.

  • Water and sewage networks
  • Water transmission pipelines
  • Service connections

Roads, Land Development & Lighting

Land preparation, road delivery and lighting works across the schemes.

  • Land development
  • Road works
  • Development lighting

Contract Packages

The work was delivered under separate contracts. Each contract remains distinct, with its own value, period and status.

Contract package

Murooj Al-Sultan – water transmission pipeline

Package value
2,830,000.00 SAR
Status
Completed

Contract package

Al-Nobala scheme – Qurban Road

Package value
750,000.00 SAR
Status
Completed

Contract package

Jiwar Taibah scheme – Airport Road

Package value
1,600,000.00 SAR
Status
Completed

Contract package

Al-Otair scheme – water and sewage networks

Package value
3,500,000.00 SAR
Status
Completed

Contract package

Fahd Al-Radadi scheme – water and sewage networks

Package value
1,230,000.00 SAR
Status
Completed

Contract package

Hisham Al-Mousa scheme – water and sewage networks

Package value
1,200,000.00 SAR
Status
Completed

Contract package

Al-Rajhi scheme – King Fahd

Package value
5,000,000.00 SAR
Status
Completed

Contract package

Al-Tanweer scheme – networks and service connections

Package value
780,000.00 SAR
Status
Completed

Contract package

Al-Mousa View – lighting works

Package value
8,500,000.00 SAR
Status
Completed

Contract package

Wael Hakim scheme – Al-Ajlan

Package value
2,200,000.00 SAR
Status
Completed

Contract package

Al-Dehesh and Al-Bahouth scheme – full development

Package value
8,450,000.00 SAR
Status
Completed

Contract package

Al-Zahid scheme – water and sewage networks

Package value
6,500,000.00 SAR
Status
Completed

Contract package

Al-Rajhi scheme – Al-Nobala

Package value
5,500,000.00 SAR
Status
Completed

Contract package

Al-Tuwaijri scheme – water and sewage networks

Package value
2,578,908.00 SAR
Status
Completed

Construction Delivery

Selected views of infrastructure works across the private-development portfolio, without attributing any image to a specific contractual package.

Aerial view of the road network and land parcels during development of a private scheme
Grading and excavation equipment carrying out land-preparation works in a private development
Internal roads illuminated at night within one of the delivered private developments
Utility-corridor and network excavation works within a private development under construction
Crew installing walkway paving as part of hardscape works in a private development
Long paved walkway after completion of hardscape works in a private development
Infrastructure Delivery for Private Developments | RTC Project