Project
Stormwater Drainage Networks in Hamra Al-Asad
We are delivering stormwater drainage networks and treating water accumulation locations across the Hamra Al-Asad schemes in Madinah for Madinah Region Municipality.
Project Facts
- Client
- Madinah Region Municipality
- Contract value
- 68,661,241.05 SAR
- Start date
- 2024-08-06
- End date
- 2027-08-05
- Duration
- 36 Months
- Contractor role
- Main Contractor
- Status
- Ongoing
- Location
- Madinah
Project
Project Overview
The project addresses stormwater drainage across the Hamra Al-Asad schemes through the construction of drainage networks and the treatment of water accumulation locations, with the works delivered inside an established urban area alongside roads that remain open to traffic.

Scope of Work
Construction of stormwater drainage networks and treatment of water accumulation across Hamra Al-Asad schemes.
Construction Delivery
Infrastructure Execution
A sequence from the project site covering excavation and corridor preparation, drainage-line installation, lifting and installation operations, and network chamber and associated structural works.