Project

Stormwater Drainage Networks in Hamra Al-Asad

We are delivering stormwater drainage networks and treating water accumulation locations across the Hamra Al-Asad schemes in Madinah for Madinah Region Municipality.

Drainage lines within the open trench along the protected work corridor beside the road

Project Facts

Client
Madinah Region Municipality
Contract value
68,661,241.05 SAR
Start date
2024-08-06
End date
2027-08-05
Duration
‎36‎ Months
Contractor role
Main Contractor
Status
Ongoing
Location
Madinah

Project

Project Overview

The project addresses stormwater drainage across the Hamra Al-Asad schemes through the construction of drainage networks and the treatment of water accumulation locations, with the works delivered inside an established urban area alongside roads that remain open to traffic.

Drainage line laid within the trench with a crane and truck in the roadside work zone at the Hamra Al-Asad project
Execution in an active road environmentExecution within an established urban area while the adjacent road remains in service

Scope of Work

Construction of stormwater drainage networks and treatment of water accumulation across Hamra Al-Asad schemes.

Construction Delivery

A sequence from the project site covering excavation and corridor preparation, drainage-line installation, lifting and installation operations, and network chamber and associated structural works.

Excavator loading excavated material into a tipper truck behind safety barriers at the roadside
Excavation and corridor preparationExcavation and material haulage within a barrier-protected work zone
Drainage line laid along the base of a long trench between concrete barriers at the project site
Drainage-line installationDrainage-line installation within the prepared trench along the network corridor
Two adjacent drainage lines within a single trench alongside the road in Hamra Al-Asad
Pipeline installation within the excavation corridorTwo adjacent lines within the trench along the roadside network corridor
Crane carrying out a lifting operation above a circular structure under construction with a worker at the edge of the work zone
Lifting and installation operationsA controlled lifting operation supporting network chamber and associated structural works
Circular structure under construction with an access ladder inside the work zone beside the road
Network chamber and associated structural worksNetwork chamber and associated structural works within the work corridor
Drainage line laid within a trench extending alongside a road open to traffic at the Hamra Al-Asad project
Drainage-network progressThe network corridor extending along the roadway with the work zone separated from live traffic