Al-Eiss Water Distribution Networks – Phase One

We are delivering Phase One water distribution lines and networks in Al-Eiss Governorate for National Water Company.

The pipeline installed within the trench on the Al-Eiss site

Project Facts

Client
National Water Company
Contract value
58,221,206.40 SAR
Start date
2025-04-15
End date
2027-04-14
Duration
‎24‎ Months
Contractor role
Main Contractor
Status
Ongoing
Location
Al-Eiss

Project

Project Overview

An ongoing 24-month delivery programme for Phase One water distribution lines and networks in Al-Eiss Governorate.

Scope of Work

Delivery of water distribution pipelines and networks for the first phase in Al-Eiss Governorate.

Construction Delivery

A concise sequence covering work-zone preparation, excavation, pipeline placement, lifting, backfilling, compaction and overall progress.

Prepared trench and protected work corridor at the Al-Eiss project site
Site and trench preparationWork-corridor and trench preparation within the mountain site context
Excavator carrying out excavation inside the protected Al-Eiss work zone
Excavation worksExcavation and material removal within the protected work zone
Pipeline placement and surrounding backfill material inside the Al-Eiss trench
Pipeline placement and backfillingPipeline placement within the trench and controlled placement of surrounding material
Crane carrying out a controlled lifting operation at the Al-Eiss construction site
Lifting and installation operationsA controlled lifting operation supporting construction activity on site
Worker operating a compactor within the prepared Al-Eiss trench corridor
Compaction worksCompaction work within the prepared trench corridor
Excavation equipment and protected work zone within the Al-Eiss urban and mountain setting
Overall construction progressOverall construction progress within the project’s urban and mountain setting